MANUAL ARQUIMEDES CYPE PDF

it must be introduced including these interruptions (or not introduce it but include its self-weight manually), so the program can assign it its corresponding. The most complete tool for Project Management: bills of quantities, project certifications and specifications. CYPECAD MEP is a program for the analysis, design and check of building IFC files generated by CAD/BIM programs; Export to IFC format; Manual data entry.

Author: Shagrel Zuzuru
Country: Cuba
Language: English (Spanish)
Genre: Education
Published (Last): 18 January 2010
Pages: 266
PDF File Size: 20.25 Mb
ePub File Size: 18.21 Mb
ISBN: 862-5-47578-959-5
Downloads: 67818
Price: Free* [*Free Regsitration Required]
Uploader: Dusida

Detailed ultimate limit state check reports.

To completely uninstall all CYPE programs spanning between the and This number will determine which is the final state, if this state is not reached before the maximum number of iterations has been undertaken. These reports contain all the checks carried out by the program to design the structures and constitute an important document manial which the user can:.

Therefore, the analysis itself, upon including the stiffness irregularity, provides greater forces in the least rigid floor, without the need of having to consider the effect indirectly by amplifying specific forces later on. General data Wind and earthquake spectral mode analysis loads are selected, by selecting the properties as described in the codes.

This displays the investment curves. Once activated, another option appears: Includes a dictionary to quickly locate concepts based on key terms. The program offers detailed ultimate limit state check reports and detailed drawings containing the corresponding reinforcement detailing. Users also have the choice to indicate their own amplification factors. For all design elements, their geometry and reinforcement can be edited and modifiedwith multiple tools to carry arquimddes the task.

  CARTABONEO DE PASOS PDF

The BOQ consolidation module of Arquimedes allows for several existing bills of quantities to be included in a base bill of quantities which can be emptyand maintain the link between the incorporated job units and their original bills of quantities. More information can be found on the Interaction of the structure with the construction elements webpage.

State 1, corresponding to the behaviour of the structure without the effect of any construction elements, and State 2 considering the effect of all the laterally confined construction elements by including their stiffness in the dynamic model and assuming they are completely effective, i.

The foundation elements, namely pad foundations and pile caps can hold several supports, be they of the same type or a combination of columns, shear walls and wall spans.

Work with parametric price banks including those compiled in DLLswith multiple prices prices for labour, materials, etc. The use of these modules requires for the user to have the corresponding license permits. The user decides which components of the list intervene in the study, indicating their quantities and price. The installation can connect different floors.

Capacity design criteria for seismic design of concrete floor slabs The geometric and mechanical properties of the columns and beams are automatically contemplated with the capacity checks as are, optionally, the properties of the floor slabs bearing on beams reaching a column.

  HANTEK DSO1200 PDF

Arquimedes. The versatile program for Project Management

City to State, add or delete cities, or modify their names. Welded and bolted joints. The option Analysis of all the installations carries out the process for all the installations of the job. Arquimedes can group these quantity lines depending on the dimensions arquimedws the elements they represent.

Download Area

You may also add as many floors, columns, beams or panels as you wish. Fifty columns Four floor groups Floor group: Otherwise the number is adequate. This way, slabs which have different geometric or mechanical properties at either side of the beam, or beams which only have the floor slab on one side can be contemplated.

This table can be copied from any file format used by the suppliers to send their offers spreadsheet, word processor, PDF Percentage mznual can also be carried out.

Each city will have a price for each unit concept which has multiple prices. Multiple prices General concepts A unit concept labour, machinery, material, unclassified unit or unjustified job item can have multiple prices, i.

Capacity design criteria for seismic design of concrete floor slabs. Depending on arquimedws stiffness of the models, the intervals and, therefore, their associated accelerations will vary. When this analysis has finished, a dialogue box appears indicating:.